LO100 SAP PDF

PLMC: LO They are available via SAPNet to Country-Specific Units None Course Instructor Profile Experienced instructor or consultant who is. Curriculum Vitae Agata Majzel SAP R/3 and Oracle Agile PLM Solution Designer BC BC BC LO LO LO LO LO LO LO Training Development and Delivery Consultant (SAP Trainer, Coach, Business Analysis, . Senior SAP PM Trainer – LO Plant Maintenance course. SAP.

Author: Shakacage Karn
Country: Sao Tome and Principe
Language: English (Spanish)
Genre: Environment
Published (Last): 12 June 2012
Pages: 163
PDF File Size: 11.85 Mb
ePub File Size: 7.49 Mb
ISBN: 768-5-62520-379-8
Downloads: 67914
Price: Free* [*Free Regsitration Required]
Uploader: Tugis

If you want to change the equipment or functional location category, the system checks whether the assigned partner functions are allowed in the new partner determination procedure. After refurbishment, the object is taken from the warehouse and re-installed in the technical asset. Functional — in other words, process-oriented for example, production linefunction-oriented for example, drive unit or spatial for example, sqp only using functional locations, at which pieces of equipment are installed.

Technical confirmations are also entered to record the repair and condition of the technical system. Although alternative labeling systems are available through an internal structure indicator, they do not affect the structure of the object.

From there, you can call up the function lo10 object’. Originate from a superior location in the structure Originate from a reference lo010 location Be maintained individually for this master record For pieces of equipment, there is an overview display list of data origin for each tab page, but no field- based display or change option.

LO – Plant MaintenanceC – Free Download PDF

You can use a status profile to limit the business transactions allowed for the respective system statuses. From what components is the shaft assembly SCA- composed?

  ACTA CONCILIORUM OECUMENICORUM PDF

You must set the execution factor for the operations according to the equipment entered in the object list.

If you do not assign a status number to a user status, you are always able to set this user status. The counter readings from the subordinate levels of an asset structure are thereby aggregated into recurring entry documents. Creation of refurbishment order: The result is the moving average price for the material. The serial number links the equipment with a material with condition-based evaluation. Confirm this start date and copy it to the maintenance plan.

You can change and adjust the format of MiniApps.

This means that lo10 can use the material serial number to also manage the equipment from Plant Maintenance from a Material Management perspective. When llo100 serial number profile is set in the appropriate way, the serial number must be specified.

The last serial number assigned for this material is displayed if a serial number was already assigned. This consists of the workplaces, at which all the necessary preparatory work is organized, for example, materials planned, and task lists created. For example, these partner types can be partners from a user-defined table.

Further education specifics, courses

A work item appears in the inbox of the addressee. The warranty items contain the services that are included or not included in the warranty. If the same task is required llo100 shortly afterwards, you can again create the maintenance order with reference to the maintenance task list. From one functional location to another From one piece of equipment to another You cannot generate links between different object types, for example, between a piece of equipment and a functional location.

In addition to change documents, it is also possible to display all changes for a particular view with old and new field contents in an action log.

  CD40103 DATASHEET PDF

Further education specifics, courses

The time axis is automatically scaled. Which numbers are assigned for the measurement reading entry list? Both measuring points or counters must have the same characteristic.

Business order release takes place independently of this. Task list At the conclusion of these exercises, you will be able to: These are validity criteria that are defined as a period of ssp or a performance counter.

If a functional location already exists for a structure indicator, the coding template can no longer be changed. Delivery date Desired vendor Fixed vendor Account assignment category Request date Release date Check whether or not the services you requested have been transferred to the purchase requisitions.

Overview of Follow-Up Courses Use the item category I for the shaft assembly and the item category L for the other items. At IDES, an internal user status determination procedure that assumes control of the object is used. Combination of code groups, grouped together according to content for example, damage to vehicles, pumps, motors or mechanical damage and electrical damage.

LO100 – Plant Maintenance-4.6C

Business Scenario IDES has different types of autonomous technical objects, which you want to structure hierarchically and find again using classification. The program uses an unique, li100 number for this which is not visible to the end user. There are two different display options available here: There are two different types of status: Are the actual working time and spare parts required considered when the stock value is changed?